March 2009: A plan reveals itself on how to overcome numerous load bearing issues.
Worked on job site logistics, bracing and teardown.
Finally, a strategy to demolish portions of the 3rd story wood rot and 40 foot high weak brick wall is devised (brick-by-brick).